Parking lot construction - List of Manufacturers, Suppliers, Companies and Products

Parking lot construction Product List

1~4 item / All 4 items

Displayed results

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuuken Park (3)

On the first floor, there is the "Odawara Citizen Exchange Center." We will introduce examples of construction using traditional methods for stores with parking lots.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a conventional construction method parking facility that includes a "Citizen Activity Plaza" and conference rooms on the first floor. Since it exceeds 100 meters in length, there are stairs leading to the elevator located in the central part of each floor. Additionally, due to the conventional construction method, fireproof coverings and fixed fire extinguishing equipment, which are not required for certified methods, have been installed. [Overview] ■ Completion Date: October 31, 2015 ■ Location: Odawara City, Kanagawa Prefecture ■ Type: 5-story, 6-tier continuous sloped floor type (1st floor facility) ■ Purpose: Public use (public works) ■ Construction Area: 12,255.36 m² ■ Capacity: 368 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Attraction Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (2)

Part of the exterior wall is constructed with louvers! Here is an example of the construction of the MIHO MUSEUM parking garage.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. To ensure that cherry blossoms can be seen from the parking lot in spring, part of the exterior wall was constructed with louvers. The exterior wall is finished with colored steel plates and louvers, and extruded cement boards were installed around the columns. Lines, parking stops, entrances and exits of the elevator shaft, and stair doors are color-coded on each floor. 【Overview】 ■ Completion date: March 15, 2019 ■ Location: Koka City, Shiga Prefecture ■ Type: 4-story, 5-level flat type ■ Purpose: For attracting customers ■ Construction area: 6,386.84 m² ■ Capacity: 256 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Amusement Stores】 Self-Contained Multi-Story Parking Lot Yuuken Park (1)

Lighting has been installed on the roof of the stairwell building! We will introduce an example of a gently sloped continuous inclined floor parking lot construction.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a low-gradient continuous sloping type that utilizes the terrain along the national highway bypass. The exterior walls feature a calm two-tone color, and the stairwell is adorned with aluminum louvers. A staircase leading to the elevator shaft has been installed in the middle section of the rooftop. Additionally, lighting has been installed on the roof of the stairwell. 【Overview】 ■ Completion Date: April 25, 2017 ■ Location: Kurashiki City, Okayama Prefecture ■ Type: 3-story, 4-level continuous sloping type ■ Purpose: For amusement store use ■ Construction Area: 7,175.20 m² ■ Capacity: 352 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Apartment Buildings】 Self-park Multi-story Parking Yuuken Park (4)

Introducing a case study of a self-parking lot for apartments surrounded by a security fence for safety!

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. It is finished with a chic color fence that matches the exterior of the apartment building. The doors leading to the external stairs of the elevator shafts on each floor display the floor number. The stairs are treated with non-slip surfaces. Additionally, for safety, an intrusion prevention fence is installed under the structural floor of the first floor. 【Overview】 ■ Completion Date: May 29, 2015 ■ Location: Kasuya District, Fukuoka Prefecture ■ Type: 4-story, 5-tier continuous sloped parking system ■ Purpose: For residential apartments ■ Construction Area: 4,667.58 m² ■ Capacity: 258 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration